Welcome to the Building Division
The building counter is open Monday through Thursday from 8 am to 5 pm.
- The counter is closed every third Thursday of the month
Building Permit Information
- The Building Division only accepts plans in an electronic format.
- Upon receipt of a complete set of construction documents, plan review will be approximately 30 calendar days for each review cycle.
The following types of permits must utilize the portal:
- Residential MEP Trade
- Residential Re-Roof
- Residential Water Heater
- Residential HVAC Mechanical
- Residential Pre-Approved ADU
- Commercial and Residential Solar / PV
- Commercial Sign
All other types of permits must bring their application to the front counter or email their application to Building Permits (buildingpermits@escondido.gov). If your application is complete and accepted, you will be given a link to upload and submit your plans electronically.
Expediting of residential rooftop solar permits is available. See information Guidelines 24A (PDF) and 24B (PDF).
Expirations & Extensions Information
Plan Check
- Valid for 1 year after submission
- 90-day extension with written approval
Permit
- Valid for 1 year after issuance and extended 180 days after inspection
- 180-day extension with written approval
Extensions may be granted after a written request is submitted and approved by staff and/or the building official. The request must include the following information: site address, permit number, reason for the additional time needed, and a signature.
- *Due to the new California Building Code update effective January 1, 2026, plan check extensions will NOT be provided on any applications submitted prior to that date.
Building Inspection Information
- The City has moved to a fully online system for scheduling and tracking building inspections. This means inspections will no longer be scheduled through our website or by phone; everything will be done through the City Portal.
- Learn More
Important Documents to assist you with the Building Process
- A2L HVAC System Affidavit (PDF)
- Accessibility Requirements for Alterations, Additions, and Structural Repairs (PDF)
- Application for Permit (PDF)
- Circuit Card (PDF)
- Climatic & Geographic Design (PDF)
- CWMP Requirements and Forms (PDF)
- Energy Regulations, Requirements & Handouts
- Fee Deferral Application (PDF)
- Fee Guide 2025 (PDF) (Updated Sept 2025)
- Hazardous Materials Questionnaire (PDF)
- Information Guidelines
- Mobilehome Installation and Accessory Structure (PDF)
- Plan Revision (PDF)
- Prerequisites for Permit Issuance (PDF)
- Roof Covering Installation Certification (PDF)
- Swimming Pool Info Packet (PDF)
- Wildland-Urban Interface Code Requirements (PDF)
- Fire Resistive Construction Requirements (PDF)
- Guidance Document: Ignition Resistant Eave Construction (PDF)
-
Christopher McKinney
Deputy City Manager
-
Douglas L. Moody
Building Official
-
Building
Physical Address
North Broadway
City Hall, First Floor, 201
Escondido, CA 92025
Phone: 760-839-4647Fax: 760-432-6819